Demo Mode — All data is simulated. No real funds, accounts, or deals.
Back to role selectorDemo mode Viewing the contractor dashboard as Marcus Webb . All data is simulated. In the live app this connects to your real deals, draws, and audit records.
1 Submit draw package → 2 Clear required conditions → 3 Complete control review → 4 Await funder authorization → 5 Track payment execution Most important draw
· Draw #3 · Harbor Logistics Center
Structural Steel Erection Bottleneck: funder approval
$2,180,000
Waiting on funder Control review has passed for Structural Steel Erection. No additional contractor action is required before funder authorization.
Completed
Draw package submitted Control review completed Release conditions satisfied Pending
Funder authorization· Funder Rail execution after approval· Selected rail Release blocked — contractor action required
· Harbor Logistics Center
Building Envelope & Roofing — $2,640,000 This release cannot advance until missing draw conditions are resolved. 4 conditions outstanding.
View deal Release readiness checklist
Lien waiver missing
Conditional lien waiver required before release gate can proceed
Open change order unresolved
Change order CO-007 must be resolved or closed by funder
Control review not current
No current control review on file for this draw request
Authorization pending after conditions clear
Release authorized only by explicit funder action
Upload lien waiver Resolve change order Request control review
Milestone release pipeline · Harbor Logistics Center Milestone Amount Owner Stage
Site Preparation & Grading
All 10 conditions met · funder authorized · released via rail
$320,000
Released
Structural Steel Erection
Control review passed · awaiting funder release approval
$2,180,000
Ready for funder approval
Building Envelope & Roofing
Lien waiver missing · change order unresolved · control review not current
$2,640,000
Release blocked
Draws awaiting control review Riverside Mixed-Use Development
MEP Rough-In — Draw 2
Under control review Amount: $680,000
Submit this draw for control review before the release gate can run. Review is a precondition; funder authorization still controls actual release.
Release-readiness checklist · Harbor Draw 4 Path from submitted to released
Contractor action required Completed prerequisites
Contract on file (signed) Schedule of values submitted Draw request submitted (Draw #3) Outstanding
Upload supporting documents Request control review After that
Funder authorization Payment execution by selected rail
Portfolio analytics Released to date
$2,640,000
Recent release activity Demo session events are shown here. In production, release activity is written to an append-only audit record with hash-chained integrity.
Client-side demo only — no production audit log written. Entries appear here as you interact with this demo session. Real Vektrum deployments write to an append-only, hash-chained audit log stored in Supabase.
Demo start System system Release gate blocked · Building Envelope & Roofing — lien waiver missing, change order unresolved
Demo start System system AI pre-review not current · Building Envelope & Roofing requires AI pre-review before release gate can proceed
Demo start System system Funder authorization pending · Structural Steel Erection — approved by gate, awaiting funder authorization
Demo start Marcus Webb contractor Draw #3 submitted for review · Structural Steel Erection — $2,180,000
Vektrum authorizes releases only after all conditions are satisfied. It does not hold funds or act as escrow. Payment execution is handled by the selected rail — Stripe Connect, title, escrow, bank wire, or your institution’s existing process.